Impact Windows · Pembroke PinesCall (561) 510-3112

Impact Windows & Doors in Pembroke Pines, FL

38,569 single-family homes in the Pembroke Pines area. 91% were built before the 2002 Florida Building Code. If yours is one of them, here's what was required when it was built and what upgrading involves.

Pembroke Pines homes at a glance

38,569single-family homes
1994median year built
18,669built before September 1994
$544,520median tax-roll market value
83%owner-occupied (homestead)
4,768homes sold since 2024

When Pembroke Pines homes were built

Before 1994
18,669 · 48%
1994–2001
16,435 · 43%
2002–2007
1,850 · 5%
2008–2015
363 · 1%
2016 or later
1,252 · 3%

Orange bars are homes built before the statewide 2002 code. Main ZIP codes: 33029, 33028, 33024, 33026.

What the code required when your home was built

Before Sept 1994

Built before Broward's post-Andrew hurricane rules. These homes were not designed for impact-rated openings, and original windows, if still in place, are usually 30+ years old.

Sept 1994 – Feb 2002

Built under the South Florida Building Code's tougher post-Andrew provisions, which called for opening protection on new homes. In practice that usually meant panel or accordion shutters, not impact glass.

March 2002 – 2007

The statewide Florida Building Code took over in March 2002 and required opening protection in the windborne-debris region. Builders typically met it with shutters. Until mid-2007 the code also allowed some homes to be engineered for internal pressure instead of protecting openings.

2008 – today

Opening protection is required, but shutters still satisfy the code. Impact glass became common because buyers wanted it, not because the code demanded it.

Full Broward County code timeline →

Pembroke Pines neighborhoods

Home counts, typical build years and values for the largest Pembroke Pines communities.

NeighborhoodHomesMostly builtMedian value
Pembroke Falls2,6751997–2003$732,690
Pembroke Lakes3,6391975–2016$533,980
Silver Lakes At Pembroke Pines1,9031991–1994$608,410
Towngate1,9601995–1999$566,595
Pasadena Lakes9881969–1974$576,595
Chapel Trail9901989–1994$675,610
Boulevard Heights3,1141961–1970$456,380
Westview1,2051976–1982$520,050
Chapel Trail Ii1,2171993–1999$491,170

Free impact window estimate in Pembroke Pines

We measure every opening, explain your options (impact windows, impact doors, or keeping your shutters), handle the permit with the City of Pembroke Pines, and give you a written quote. Mention code WEBPPN.

Questions Pembroke Pines homeowners ask

Do I need a permit to replace windows and doors?

Yes. Window and exterior door replacement requires a building permit in Florida. In Pembroke Pines it is issued by the City of Pembroke Pines. We pull the permit, schedule the inspections, and close it out.

Are hurricane shutters still allowed, or is impact glass required?

Shutters are still allowed. The Florida Building Code requires opening protection in hurricane-prone coastal areas, and either code-approved shutters or impact-rated windows and doors satisfy it. Impact glass is the convenience upgrade: nothing to put up before a storm, better security, and less noise.

Will impact windows lower my homeowners insurance?

Often. Florida law requires insurers to offer discounts for wind-mitigation features, and protected openings are one of the credits. A wind-mitigation inspection after installation documents the upgrade for your insurer. The amount depends on your carrier, policy and the rest of the house.

My home already has shutters. Is replacing windows worth it?

It depends on your goals. If your shutters are in good shape and you don't mind putting them up, they still meet code. Owners usually switch for convenience, security, noise, energy efficiency, or because the original windows are leaking or failing. We'll give you an honest read either way.

Does my HOA need to approve new windows?

Many Pembroke Pines communities require architectural approval for exterior changes, including window frame color and style. We provide the product approvals and specs your HOA asks for.

How long does a project take?

Most of the wait is the manufacturer's lead time for custom impact units. Once product arrives, a typical home is installed in a few days, followed by the final inspection.